Septic replacements and additions: the dumpster side
Outer Cape and older mid-Cape properties do a lot of septic work. Additions follow the new system.
June 12, 2024
A roll-off is for the construction debris: old decking, broken concrete that the crew wants off the lot, lumber, and interior demo from the addition. Excavated soil and a decommissioned tank are not automatically “throw it in the 30.” Say what the load is when you book.
Truro and Eastham lots are often long and soft. The truck needs a firm pad at the house or near the road — pick one and commit.
Fourteen days usually covers the messy middle of an addition. If the job runs long, extend instead of overflowing onto the lawn.
Dumpster sizes · Cape Cod towns · FAQ · Blog